Compiled 2026-09-06 from Greg's local files. Every row cites a source file. Rows with no nameplate source are marked ESTIMATE and carry a stated basis.
The email dossier records that SCE owed TRC "13 months of 15-minute demand CSVs for both meters" and that none appear delivered. They were delivered, and they are on disk.
~/Library/CloudStorage/Dropbox-RecordingClub/Greg Spero/Greg's Dropbox/SCE/FULL DATA 2025-JAN2026/
SCE_Usage_[account]_01-01-25_to_01-29-26.csv (37,724 intervals)
SCE_Usage_[meter 3]_01-01-25_to_01-29-26.csv (37,724 intervals)
15-minute kWh "Delivered" per meter, 2025-01-01 through 2026-01-28. Demand kW = kWh x 4. Meter resolution is 0.4 kWh, so every reading quantizes to a multiple of 1.6 kW.
The March 2025 bill (TRC/Electric/ViewBill03262025.pdf,
and the SCE folder bills) lists service accounts
[account] and SCE meter 3, both at 1660
9TH ST, under customer account [account].
| [account] (now [account]) | SCE meter 3 | |
|---|---|---|
| Rate (Dec 2025 bill) | TOU-GS-2-E, already demoted | TOU-GS-1-E |
| Threshold on bill | 199 kW | 20 kW |
| Demand charge | Facilities-related 13 kW x $14.81 = $192.53 | none billed |
| 13-mo energy | 30,438 kWh | 38,885 kWh |
| 13-mo max 15-min demand | 27.2 kW | 14.4 kW |
| Intervals >20 kW in 13 mo | 50 | 0 |
Source: SCE/ViewBill01052026.pdf lines for both
accounts; CSV analysis above.
SCE meter 3 has never come close to 20 kW. The entire demand problem lives on [account] (the account the BRIEF says closed 1/29/26 and was replaced by [account]).
| Month | 754 | 769 | Combined |
|---|---|---|---|
| 2025-01 | 20.8 | 12.8 | 28.8 |
| 2025-02 | 19.2 | 11.2 | 24.0 |
| 2025-03 | 20.8 | 11.2 | 25.6 |
| 2025-04 | 20.8 | 12.8 | 27.2 |
| 2025-05 | 22.4 | 12.8 | 30.4 |
| 2025-06 | 20.8 | 12.8 | 28.8 |
| 2025-07 | 27.2 | 12.8 | 35.2 |
| 2025-08 | 27.2 | 14.4 | 36.8 |
| 2025-09 | 19.2 | 12.8 | 30.4 |
| 2025-10 | 20.8 | 11.2 | 30.4 |
| 2025-11 | 14.4 | 14.4 | 24.0 |
| 2025-12 | 12.8 | 12.8 | 22.4 |
| 2026-01 | 19.2 | 12.8 | 24.0 |
Combined percentiles across all 37,724 intervals: p50 6.4 kW, p90 14.4 kW, p99 22.4 kW, p99.9 28.8 kW, max 36.8 kW. Overnight (3-5am) combined base load: median 3.2 kW, p90 6.2 kW.
Sustained runs at >=11 kW lasting >=1 hour, and intervals >=16 kW, on meter 754:
| Month | Sustained >=11 kW runs >=1 h | Intervals >=16 kW |
|---|---|---|
| 2025-05 | 20 | 97 |
| 2025-06 | 18 | 60 |
| 2025-07 | 26 | 93 |
| 2025-08 | 34 | 133 |
| 2025-09 | 20 | 24 |
| 2025-10 | 8 | 22 |
| 2025-11 | 1 | 0 |
| 2025-12 | 3 | 0 |
| 2026-01 | 3 | 2 |
That step change lands exactly on the Nov/Dec 2025 EV-charger
limiting recorded in context/email-dossier.md:16. Longest
single sustained run: 660 minutes (11 hours). Greg measured Tesla
charging at 11.3 kW
(context/texts-ari-electrical.txt:161).
The billed quantity is a 15-minute average, not an
instantaneous peak. The 2025-08-23 peak was 27.2 kW on meter 754 held
across consecutive intervals from 16:45 to 18:45, and 2025-07-31 held
25.6-27.2 kW across 18:30 and 19:00. A compressor inrush lasting 0.5-3
seconds contributes at most 3/900ths of a 15-minute window. To move that
average by 1 kW an inrush would have to last 5 minutes. The
measured peaks are sustained running load, not startup
transients. This corroborates Farzad
(texts-ari-electrical.txt:772) and Victor
(texts-ari-electrical.txt:976) against Ari's inrush theory.
Confidence: high.
Phase note: Farzad, 2026-09-04, "sauna is the only equipment that
uses 3 phase and there's already an existing 240V outlet. All the other
work was done in 110V" (context/texts-taji-chats.txt:456).
He then confirmed the AC units are 220V
(texts-taji-chats.txt:458-460). Both statements can be
true: the ACs are 240V single-phase (split-phase, two hot
legs), which is what the one nameplate we have says.
The building has 7 rooftop units total
(TRC/AC/RFP/TRC_Live_Room_HVAC_RFP.md, section 2;
TRC/AC/RFP/TRC AC Issue Document 3_18_26.pdf, "The building
has 7 units total"). Only two have a documented model.
| # | Room / label | Model | Phase / volts | Running kW | Source |
|---|---|---|---|---|---|
| 1 | Live Room + Iso Booth ("System 1, Main Studio" + Lounge on the balance report) | AC Pro PKHP-M-0601BB, 5-ton heat pump package, replaced 2025 | 1-phase, 230 V (explicit) | 5.5-6.5 ESTIMATE (5-ton package HP: compressor 4.5-5.5 + condenser fan 0.25 + blower 0.6-0.9) | TRC/AC/Brian Banks info/.../Pacific Air Co. Proposal 5-23-25.pdf
item 2; TRC/AC/Airflow Report - Recording Club.pdf
MFG/MODEL; TRC/AC/RFP/TRC_Live_Room_HVAC_RFP.md sec. 4 |
| 2 | Mixing Room ("newer unit, separate system") | unknown | unknown, presumed 240 V 1-ph | 3.5-4.5 ESTIMATE (3-4 ton) | TRC/AC/RFP/TRC_Live_Room_HVAC_RFP.md sec. 4, photo
rooftop_unit_mixing_room.jpg;
ac-project-plan.pdf ("Mixing Room over-cooled, has spare
capacity") |
| 3 | "System #3", damaged aluminum refrigerant pipes, proposed for replacement 4/13/2025 | Carrier 48ESNA4809030, S/N 2512C36393, 4.0-ton down-discharge heat pump | 220 V (stated) | 4.5-5.0 ESTIMATE (4-ton package) | TRC/AC/Reyes - Proposal Greg Spero 1660 9th St Santa Monica CA 90404.pdf |
| 4 | unknown room, one of the two Ari identified as spiking ("ac units 4 & 7") | unknown | unknown | 2.5-4.5 ESTIMATE | texts-ari-electrical.txt:775 |
| 5 | unknown room | unknown | unknown | 2.5-4.5 ESTIMATE | 7-unit count, RFP |
| 6 | unknown room (office AC known to exist and to have failed 3/22/26) | unknown | unknown | 2.5-4.5 ESTIMATE | texts-ari-electrical.txt:792, :111 |
| 7 | unknown room, the second Ari flagged | unknown | unknown | 2.5-4.5 ESTIMATE | texts-ari-electrical.txt:775 |
Corroboration on the count: Elite Heating's Apr 2025 estimate prices
preventive maintenance on "the six HVAC rooftop
systems" plus the one Lennox replacement = 7
(TRC/AC/Elite Heating and Air Conditioning - estimate_16393.pdf).
That estimate also quotes a Lennox LRP13HPK60EP explicitly as "5
Ton, 208-230v 1ph 60 hz", further evidence the rooftop fleet
is single-phase.
Also on record: the Live Room unit is starved on airflow, measured
1,528 CFM actual against 2,000 design (76%), total external static 1.44
in. w.c. against 0.8 rated
(TRC/AC/Airflow Report - Recording Club.pdf, 04/16/2026,
NCI cert 17-399-01). A unit fighting nearly double its rated static
draws more power, not less. That is a live contributor
to running demand.
HVAC subtotal, all 7 running: 24-33 kW ESTIMATE.
| Load | Model | Phase / volts | Running kW | Source |
|---|---|---|---|---|
| EV / Tesla charger | unknown wall connector | 240 V 1-ph | 11.3 measured, since limited to an unknown lower setting | texts-ari-electrical.txt:161 ("Tesla charges was 11.3
kw"); limiting recorded in context/email-dossier.md:16 |
| Sauna heater | unknown | 3-phase, existing 240 V outlet, the only 3-phase equipment on site | 6.0 ESTIMATE (commercial sauna heaters cluster at 6/8/9 kW; 6 kW is the common 240 V unit) | context/texts-taji-chats.txt:456 |
| Cold plunge chiller | unknown | presumed 120 V | 0.5-1.0 ESTIMATE (1/3-1 HP chiller) | texts-ari-electrical.txt:781 (listed alongside sauna
and Tesla charger for monitoring) |
| LED video wall | IYO LED, 49 x DW1.9 SPro cabinets, 24" x 13.5" each, P1.9, 650 cd/m2, GOB; NovaStar VX600 controller | presumed 120 V, multiple PSUs | max 6-9, typical 2.5-3.5 ESTIMATE (P1.9 GOB cabinets of this size run ~130-190 W max, ~45-70 W average content; 49 x 160 W = 7.8 kW max, 49 x 55 W = 2.7 kW typical) | ~/.claude/projects/-Users-gregspero-claude-grid/memory/reference_trc_led_wall_purchase.md |
| Live Room stage lighting rig | LED pars, spots, moving heads on truss | 120 V | 2.0-4.0 max, 1.0-1.5 typical ESTIMATE | TRC/AC/RFP/TRC_Live_Room_HVAC_RFP.md sec. 4 "Heat
sources"; landlord 2025-12-19: "extra heat load generated by the light
rig... may be the tipping point"
(texts-ari-electrical.txt:642) |
| Mixing room / control room audio | Trident 88 console, Pro Tools rig, 8 outboard preamps (2 Demeter / 4 AEA / 2 Manley), Ocean Way mains + amps, outboard racks | 120 V | 1.5-2.5 ESTIMATE | ~/trc-studio-docs-site/data/corpus.json;
data/manuals/trident-88.md |
| Other 3 rooms' gear (Recording, Rehearsal, Podcast) | amps, keyboards, PA, monitors, cameras, LED screens | 120 V | 0.3-0.8 each, 1.0-2.4 total ESTIMATE | project_trc_rooms.md;
TRC AC Issue Document |
| Kitchen | full kitchen; multiple mini fridges (SCE named mini fridges "the most common culprit of power demand spikes") | 120 V | 1.5-3.0 ESTIMATE (main fridge 0.15-0.5 running, mini fridge 0.05-0.12 each running but 0.6-0.8 starting, microwave 1.2-1.5 intermittent, dishwasher 1.2-1.8) | texts-ari-electrical.txt:102;
TRC/Building/video/Fridge/ |
| House lighting, network, servers, cameras, security | Vivint system, glass-break monitors, camera rig | 120 V | 2.0-3.0 ESTIMATE | texts-taji-chats.txt:507, :89;
project_piano_wine_camera_setup.md |
| Water heater | unknown, may be gas | unknown | 0 if gas, 4.5 if electric ESTIMATE | not found in any local file |
TRC/Inspection/Spero & Midler 1660 9th St. Santa Monica, CA 90404-Secured.pdf,
"MAIN PANEL SPEC'S" and "PATH OF ELECTRICAL".texts-ari-electrical.txt:145,
:159).texts-ari-electrical.txt:514-517).Everything TRC can turn on at once, all seven ACs loaded, sauna hot, wall bright, car charging.
| Group | kW |
|---|---|
| 7 rooftop AC units, all running | 28.0 |
| Sauna heater (3-phase) | 6.0 |
| EV charger, unlimited | 11.3 |
| LED wall, bright content | 7.0 |
| Live Room lighting rig, full | 3.0 |
| All studio audio (mixing + 4 rooms) | 4.0 |
| Kitchen | 2.5 |
| House lighting, IT, security, cameras | 2.5 |
| Cold plunge | 0.8 |
| Total connected, zero diversity | 65.1 kW |
| With realistic coincidence (AC 0.8, kitchen 0.6, lighting 0.8) | ~55 kW |
| With the EV charger limited as it is today | ~46 kW |
Sanity check against measurement: the highest 15-minute reading ever recorded across both meters is 36.8 kW (2025-08-23 17:45). That peak almost certainly did not include the sauna and the EV charger and a fully lit LED wall simultaneously, which is why the bottom-up worst case sits above it. Treat 45-55 kW as the true worst case and 36.8 kW as the demonstrated worst case. Confidence: moderate on the bottom-up figure, high on the 36.8 kW.
Summer weekday, 6-9pm, a session in the Live Room and one other room, four ACs running, no sauna, no EV charging, LED wall on typical content.
| Group | kW |
|---|---|
| 4 rooftop AC units running (incl. the 5-ton) | 16.0 |
| LED wall, typical content | 3.0 |
| Live Room lighting rig, show level | 1.5 |
| Mixing room + 2 active rooms of audio | 2.5 |
| Kitchen | 1.5 |
| House lighting, IT, security | 2.5 |
| Total | 27.0 kW |
Sanity check against measurement: combined 95th-percentile demand in summer evening hours is 22-24 kW (18:00-21:00, Jun-Sep). Winter evening 95th percentile is 16-18 kW. The bottom-up 27 kW sits just above the measured 95th percentile and below the measured max, which is the right place for it. Confidence: high.
Everything below is a physical nameplate read or a panel trace. None of it exists in any file on this machine.
For each unit, in order, and tag each unit with the number staff already use ("units 4 & 7"):
texts-ari-electrical.txt:980); Farzad says only the sauna
is (texts-taji-chats.txt:456). One of them is wrong and the
answer decides whether hard-start kits can be fitted at all.| Path | What it gave |
|---|---|
~/electrical-plan/context/BRIEF.md |
Framing, SCE account numbers, cast |
~/electrical-plan/context/texts-ari-electrical.txt |
Demand spikes, soft-starter thread, Tesla 11.3 kW, mini-fridge warning, 7 soft starters quote |
~/electrical-plan/context/texts-taji-chats.txt |
Farzad phase answer, Victor compressor-saver thread |
~/electrical-plan/context/email-dossier.md |
EV-charger limiting timeline, SCE contradictions, Zinsco closure |
.../Dropbox/SCE/FULL DATA 2025-JAN2026/*.csv |
13 months of 15-minute interval data, both meters |
.../Dropbox/SCE/ViewBill01052026.pdf and 12 other
bills |
Rate schedules, per-meter thresholds, $14.81/kW demand charge |
.../Dropbox/TRC/AC/RFP/TRC_Live_Room_HVAC_RFP.md and
TRC AC Issue Document 3_18_26.pdf |
7-unit count, Live Room model, room dimensions, duct layout |
.../Dropbox/TRC/AC/Airflow Report - Recording Club.pdf |
Measured 1,528 of 2,000 CFM, 1.44 vs 0.8 in. w.c. |
.../Dropbox/TRC/AC/Reyes - Proposal ....pdf |
Carrier 48ESNA4809030, 4-ton, 220 V |
.../Dropbox/TRC/AC/Brian Banks info/.../Pacific Air Co. Proposal 5-23-25.pdf |
"1-phase, 230 volts, ACPRO M# PKHP-M-0601BB" |
.../Dropbox/TRC/AC/Elite Heating ... estimate_16393.pdf |
"six HVAC rooftop systems"; Lennox 5-ton quoted 208-230 V 1 ph |
.../Dropbox/TRC/Inspection/Spero & Midler ...-Secured.pdf |
Zinsco, 200/400 A service, overhead feed, panel location |
~/.claude/.../memory/reference_trc_led_wall_purchase.md |
49 IYO DW1.9 SPro cabinets, NovaStar VX600 |
~/trc-demand-pricing/data/GROUND-TRUTH.md |
Room list, operating hours, occupancy by daypart |
~/trc-studio-docs-site/data/ |
Studio audio equipment (no HVAC or electrical content) |
Searched and found nothing relevant: ~/Documents,
~/Desktop, ~/Projects, the Gregbrain Obsidian
vault, ~/trc-inventory-db, ~/trc-manual,
~/trc-canonical.